Explore 1IX

Makati showroom · Philippine engineering team
24/7 NOC support

All solutions

Industries we serve

Data Center & Real Estate

Plan the compute and network infrastructure for racks, buildings and tenants on one page. Match capacity, isolation and resilience to the services your facility needs to deliver.

A design matched to your operation

EVPN-VXLAN campus fabric with core, distribution and access layers
Illustrative architecture. The final design follows your site and equipment requirements.

Data center racks

Plan Dell server compute and storage alongside QFX switching. Size server-facing ports, rack uplinks, east-west traffic and redundant paths before selecting the equipment.

Fabric architecture

A leaf-spine fabric provides a repeatable pattern for rack growth. EVPN-VXLAN can separate tenant networks over a routed underlay; the illustrated campus fabric uses distinct core, distribution and access layers.

Buildings & tenants

Coordinate building fiber, floor switching, WiFi and security. Use a collapsed core or a larger fabric to suit the property, keeping tenant services separate from building-management traffic.

The decisions that matter

EVPN-VXLAN explained

VXLAN carries separate logical networks across an IP fabric; EVPN distributes reachability information. Together they help scale segmentation without treating every rack as a separate network design.

Tenant isolation

Define VLANs, routing instances and security boundaries for tenants and shared services. Agree how Internet access, management and cross-tenant traffic are controlled.

Capacity & redundancy

Budget for uplink oversubscription, optics, spare ports and power. Validate link and device failures so expansion does not introduce an unexpected single point of failure.

Compute & recovery

Size CPU, memory and storage for virtual machines and data services. Plan backup traffic and recovery requirements alongside production workloads.

From equipment plan to handover

01 / Scope & quote

Receive an itemized equipment and services proposal. Confirm stock, delivery timing, installation scope and warranty options for your selected hardware.

02 / Configure & test

Agree staging, configuration, connectivity and failover checks before deployment. Plan the migration window and rollback steps around your operations.

03 / Deploy & support

Arrange installation, documentation and handover with local engineers. Define warranty coverage and the 24/7 support and escalation process in your quote.

Tell us what you need to build

Share what you already know. Our engineers can help clarify the remaining requirements.

  • Rack count, server interfaces and expected traffic between workloads
  • Building plans, tenant count, fiber paths and security boundaries
  • Power, cooling, growth targets and recovery requirements