Budgetary
Dell PowerEdge R740xd
- CPU
- 2 × Intel Xeon Gold · 2nd Gen
- RAM
- 128GB ECC DDR4
- Data drives
- 12 × 8TB HDD · RAID 6
Value-focused Gold CPUs. Exact parts, stock and pricing are shown in the configurator; unpriced items require a quote.
Customize →Servers / Choose by Workload
Start with a suggested build. Customize the components for your workload, then review current pricing and availability.
Read the technical sizing guide ↓Budgetary
Value-focused Gold CPUs. Exact parts, stock and pricing are shown in the configurator; unpriced items require a quote.
Customize →Performance
Value-focused Gold CPUs. Exact parts, stock and pricing are shown in the configurator; unpriced items require a quote.
Customize →Suggested builds are starting points, not performance guarantees. Confirm software licensing, usable capacity, RAID layout and workload requirements before ordering.
Technical buying guide
A backup repository is usually capacity-intensive, but its success is measured by whether backups finish and restores work on time. Drive space, sustained throughput, CPU processing and network capacity all contribute. Size production storage and the recovery copy separately: a large RAID array is not an independent backup.
1IX editorial · Sources checked
Retention, daily change, growth, redundancy and free-space reserve.
Sustained ingest, synthetic operations and restore throughput.
Concurrent tasks, compression, encryption and repository roles.
RPO (recovery point objective) is the amount of data loss the business can tolerate, expressed as time. RTO (recovery time objective) is the target time to restore service. Neither follows automatically from a RAID level. List the critical systems, restore order, recovery destination and verification steps. An isolated or immutable copy and a tested restore process address risks that disk redundancy alone cannot.
Sizing visual · Calculated example
12 × 20 TB drives · 240 TB raw · decimal units
Compare usable capacity and protection behavior, not just raw terabytes.
Calculated by 1IX for one equal-drive array: RAID 6 = (12 − 2) × 20 TB; RAID 10 = 12 × 20 TB ÷ 2. Excludes hot spares, formatting, metadata and free-space reserve. This compares capacity, not performance or guaranteed recoverability.
For a single array of equal-sized drives, a simple RAID 6 capacity estimate is (drive count − 2) × drive capacity; RAID 10 is approximately half the raw capacity. For example, 12 × 20 TB gives 240 TB raw, about 200 TB in RAID 6 or 120 TB in RAID 10 before formatting, spares, filesystem overhead and reserve. Decimal TB differs from binary TiB. Retention models must include full backups, changed blocks and temporary operations; do not assume a fixed compression ratio.
Estimate required transfer rate as bytes moved divided by available seconds. Then check source reads, proxy processing, network transport and repository writes. The graph below models 4 TB of data actually transferred, not the nominal source dataset before deduplication. Allow additional time for setup, contention and verification. A 1 Gb/s Ethernet link has a theoretical ceiling of 125 MB/s before overhead; it cannot carry 4 TB in an eight-hour window.
Sizing visual · Calculated example
Ideal data-transfer time for 4 TB · lower is better
Transfer time (hours)
Swipe the graph horizontally if needed, or open the numerical data below.
| Sustained end-to-end payload rate (MB/s) | 4 TB data transfer · Transfer time (hours) |
|---|---|
| 125 | 8.89 |
| 250 | 4.44 |
| 500 | 2.22 |
| 1000 | 1.11 |
Recovery targets require measured end-to-end throughput, not just fast network ports.
Calculated by 1IX: 4,000,000 MB ÷ sustained MB/s ÷ 3,600. Rounded values. Excludes provisioning, database recovery, validation and other service-restoration work; transfer time alone is not RTO. 125 MB/s is the theoretical raw rate of 1 Gb/s Ethernet, not its attainable application payload.
Veeam’s repository documentation ties CPU requirements to concurrent tasks. For machine-disk processing it specifies 4 GB RAM plus at least 1 GB per concurrently processed disk; unstructured data has different requirements. These are role-specific requirements, not a recommendation for the complete server. Combined roles need combined resources. Repository task limits can prevent excessive simultaneous I/O, and synthetic fulls or health checks must be included in performance planning.
Sources: Veeam: backup repository system requirements · Veeam: repository load control and concurrent tasks
MB/s · decimal units · lower window means higher required rate
The current storage presets use this capacity-oriented platform. Check drive bays, supported disk sizes, controller mode and rebuild behavior before choosing a larger disk.
Consider where the repository also needs newer I/O expansion or heavier processing. Confirm backplane, controller and application compatibility in the quoted build.
Consider when processing or I/O requirements justify the platform change. Faster memory cannot overcome a saturated network or a slow disk array; size the full data path.
Generation names describe a family, not a guaranteed configuration. R750, R750xs, R760, R760xs, R760xa and storage variants have different limits. Confirm the exact CPU, memory layout, backplane, controller, firmware and software support in your quote.
Share your measurements and growth plan. Ask us to separate equipment pricing from configuration, migration, deployment, support and warranty options, with stock, lead times and service scope confirmed in writing.