Tuklasin ang 1IX

Showroom sa Makati · Engineering team sa Pilipinas
Suportang NOC 24/7

Bumuo ng Server

Servers / Pumili ayon sa Gawain

Virtualization

Magsimula sa mungkahing build. I-customize ang mga component para sa iyong workload, at suriin ang kasalukuyang presyo at availability.

Basahin ang technical sizing guide (English) ↓

Abot-kayang opsyon

Dell PowerEdge R740xd

CPU
2 × Intel Xeon Gold · 2nd Gen
RAM
1TB ECC DDR4
Mga data drive
6 × 8TB HDD

Xeon Gold na nakatuon sa sulit na halaga. Nasa configurator ang eksaktong piyesa, stock at presyo; kailangan ng quote para sa mga item na wala pang presyo.

I-customize →

Mataas na performance

Dell PowerEdge R750xs

CPU
2 × Intel Xeon Gold · 3rd Gen
RAM
1TB ECC DDR4
Mga data drive
6 × 3.84TB SSD

Xeon Gold na nakatuon sa sulit na halaga. Nasa configurator ang eksaktong piyesa, stock at presyo; kailangan ng quote para sa mga item na wala pang presyo.

I-customize →

Panimulang mungkahi ang mga build, hindi garantiya ng performance. Kumpirmahin ang software licensing, usable capacity, RAID at workload bago umorder.

Technical buying guide · English

Sizing a virtualization host: RAM capacity, memory bandwidth and shared I/O

A virtualization host runs many applications at once. The useful question is how many of your VMs it can run within their response-time targets, including maintenance and a host failure. CPU core count alone cannot answer that. Start with measured simultaneous demand, then size memory, compute and storage as one system.

1IX editorial · Sources checked

Memory first

Concurrent VM working sets, hypervisor overhead and failover reserve.

CPU concurrency

Physical cores, per-core speed and the amount of work active at once.

Shared I/O

Datastore latency, burst IOPS and migration or backup traffic.

Capacity is GB; bandwidth is how quickly the CPUs receive data

RAM capacity determines whether active guest workloads fit in memory. Memory bandwidth describes the rate at which data can move between memory and processors. A large RAM total does not guarantee a balanced DIMM layout. Populate channels according to the exact Dell model manual; the CPU, DIMM type and number of DIMMs per channel affect the operating data rate. MT/s means million transfers per second, rather than a capacity measurement.

Sources: Dell PowerEdge R740 / R740xd technical guide · Dell PowerEdge R750 technical guide · Dell: R750 versus R760 memory bandwidth — original STREAM graphs and test configuration

Sizing visual · Calculated example

Where 512 GB of host RAM goes

Illustrative memory budget · GB · one host

20 VMs × 16 GBHost servicesGrowth / failover reserveUnallocated
0 GB256 GB512 GB
512 GB installed320 + 32 + 128 + 32 = 512 GB

Size the guests, host and resilience reserve separately.

1IX planning example: 320 GB guest allocation + 32 GB assumed host overhead + 128 GB chosen reserve + 32 GB spare. These are scenario assumptions, not universal hypervisor requirements. Validate actual overhead and cluster failover demand.

NUMA locality and virtual CPU sizing

NUMA means non-uniform memory access: a processor reaches its local memory differently from memory attached to another socket. Large VMs need a deliberate virtual NUMA layout. Microsoft warns that placing virtual processors and memory on different NUMA nodes can reduce performance. Give a VM the vCPUs its workload needs, then measure contention before increasing allocations. A vCPU is scheduled processing capacity; it is not a dedicated physical core.

Sources: Microsoft: Hyper-V processor performance and virtual NUMA

Consolidation also concentrates storage and network demand

Many individually modest VMs can create a demanding mixed-I/O workload when their backups, updates and databases run together. Separate capacity planning from IOPS (operations per second) and latency (time per operation). Assess SSD or supported NVMe storage for latency-sensitive guests; HDD capacity can still suit colder data. Reserve host resources and test a failure scenario. In a three-host cluster, the remaining two hosts must sustain the required workload if one host is unavailable.

Sources: Microsoft: Hyper-V hardware selection

Sizing visual · Calculated example

How VM growth changes host memory demand

Illustrative demand at 16 GB per VM plus 32 GB for the host

Guest + host demand512 GB physical host

Memory demand / capacity (GB)

Swipe the graph horizontally if needed, or open the numerical data below.

019238457676810203040Concurrent VMs
View numerical data
How VM growth changes host memory demand: plotted values
Concurrent VMsGuest + host demand · Memory demand / capacity (GB)512 GB physical host · Memory demand / capacity (GB)
10192512
20352512
30512512
40672512

In this example, 30 VMs consume the entire physical capacity before any resilience reserve.

Calculated by 1IX: VM count × 16 GB + 32 GB. This models full simultaneous allocation, not dynamic-memory behavior or a CPU performance limit. Points are sizing scenarios; no VM-count guarantee is implied.

A practical sizing exercise

For illustration, 20 VMs each requiring 16 GB concurrently account for 320 GB of guest RAM before host overhead and resilience reserve. That is a demand calculation, not a recommendation to buy the next standard capacity. Also collect peak CPU utilization, storage read/write latency, backup windows and migration traffic. Check hypervisor support, software licensing and live-migration CPU compatibility before mixing generations.

Sources: Microsoft: processor compatibility for Hyper-V VMs

What Dell measured: sustainable memory bandwidth

Relative index · R750 = 100 · higher is better

R750 · DDR4-3200100
R760 · DDR5-4800146
1IX visualization of Dell’s reported 46% STREAM Triad improvement at eight populated DIMMs per CPU. Different CPUs and memory technology were tested. This is a memory benchmark, not a 46% increase in VM count or application speed. Dell’s original graphs and detailed configuration are linked below. View original Dell graphs and methodology →

How the offered Dell generations fit

14G · R740 / R740xd

DDR4 with six memory channels per CPU. Consider for consolidation where measured demand fits and platform support meets the deployment horizon.

15G · R750 / R750xs

A DDR4 generation with PCIe 4.0 options. Standard R750 has eight memory channels per CPU. R750xs is a distinct platform: check its DIMM, processor, riser and drive limits separately.

16G · R760 family

DDR5 increases the available memory data rate. The benefit is most relevant when memory bandwidth is a measured constraint; CPU selection, DIMM population and chassis variant still matter.

Generation names describe a family, not a guaranteed configuration. R750, R750xs, R760, R760xs, R760xa and storage variants have different limits. Confirm the exact CPU, memory layout, backplane, controller, firmware and software support in your quote.

References and original technical evidence

Turn the workload into an itemized proposal

Share your measurements and growth plan. Ask us to separate equipment pricing from configuration, migration, deployment, support and warranty options, with stock, lead times and service scope confirmed in writing.

Compare suggested builds ↑