Tuklasin ang 1IX

Showroom sa Makati · Engineering team sa Pilipinas
Suportang NOC 24/7

Bumuo ng Server

Servers / Pumili ayon sa Gawain

Storage at Backup

Magsimula sa mungkahing build. I-customize ang mga component para sa iyong workload, at suriin ang kasalukuyang presyo at availability.

Basahin ang technical sizing guide (English) ↓

Abot-kayang opsyon

Dell PowerEdge R740xd

CPU
2 × Intel Xeon Gold · 2nd Gen
RAM
128GB ECC DDR4
Mga data drive
12 × 8TB HDD · RAID 6

Xeon Gold na nakatuon sa sulit na halaga. Nasa configurator ang eksaktong piyesa, stock at presyo; kailangan ng quote para sa mga item na wala pang presyo.

I-customize →

Mataas na performance

Dell PowerEdge R740xd

CPU
2 × Intel Xeon Gold · 2nd Gen
RAM
256GB ECC DDR4
Mga data drive
12 × 20TB HDD · RAID 10

Xeon Gold na nakatuon sa sulit na halaga. Nasa configurator ang eksaktong piyesa, stock at presyo; kailangan ng quote para sa mga item na wala pang presyo.

I-customize →

Panimulang mungkahi ang mga build, hindi garantiya ng performance. Kumpirmahin ang software licensing, usable capacity, RAID at workload bago umorder.

Technical buying guide · English

Sizing storage and backup: usable capacity, ingest rate and recovery time

A backup repository is usually capacity-intensive, but its success is measured by whether backups finish and restores work on time. Drive space, sustained throughput, CPU processing and network capacity all contribute. Size production storage and the recovery copy separately: a large RAID array is not an independent backup.

1IX editorial · Sources checked

Usable capacity

Retention, daily change, growth, redundancy and free-space reserve.

Disk and network

Sustained ingest, synthetic operations and restore throughput.

CPU and RAM

Concurrent tasks, compression, encryption and repository roles.

Start with the recovery objective

RPO (recovery point objective) is the amount of data loss the business can tolerate, expressed as time. RTO (recovery time objective) is the target time to restore service. Neither follows automatically from a RAID level. List the critical systems, restore order, recovery destination and verification steps. An isolated or immutable copy and a tested restore process address risks that disk redundancy alone cannot.

Sizing visual · Calculated example

One disk set, different usable capacity

12 × 20 TB drives · 240 TB raw · decimal units

Nominal usable capacityRedundancy overhead
0 TB120 TB240 TB
RAID 6200 TB usable + 40 TB parity equivalent
RAID 10120 TB usable + 120 TB mirror equivalent

Compare usable capacity and protection behavior, not just raw terabytes.

Calculated by 1IX for one equal-drive array: RAID 6 = (12 − 2) × 20 TB; RAID 10 = 12 × 20 TB ÷ 2. Excludes hot spares, formatting, metadata and free-space reserve. This compares capacity, not performance or guaranteed recoverability.

Raw terabytes are not usable terabytes

For a single array of equal-sized drives, a simple RAID 6 capacity estimate is (drive count − 2) × drive capacity; RAID 10 is approximately half the raw capacity. For example, 12 × 20 TB gives 240 TB raw, about 200 TB in RAID 6 or 120 TB in RAID 10 before formatting, spares, filesystem overhead and reserve. Decimal TB differs from binary TiB. Retention models must include full backups, changed blocks and temporary operations; do not assume a fixed compression ratio.

The slowest stage determines the backup window

Estimate required transfer rate as bytes moved divided by available seconds. Then check source reads, proxy processing, network transport and repository writes. The graph below models 4 TB of data actually transferred, not the nominal source dataset before deduplication. Allow additional time for setup, contention and verification. A 1 Gb/s Ethernet link has a theoretical ceiling of 125 MB/s before overhead; it cannot carry 4 TB in an eight-hour window.

Sizing visual · Calculated example

How sustained transfer rate changes restore time

Ideal data-transfer time for 4 TB · lower is better

4 TB data transfer

Transfer time (hours)

Swipe the graph horizontally if needed, or open the numerical data below.

02.557.5101252505001000Sustained end-to-end payload rate (MB/s)
View numerical data
How sustained transfer rate changes restore time: plotted values
Sustained end-to-end payload rate (MB/s)4 TB data transfer · Transfer time (hours)
1258.89
2504.44
5002.22
10001.11

Recovery targets require measured end-to-end throughput, not just fast network ports.

Calculated by 1IX: 4,000,000 MB ÷ sustained MB/s ÷ 3,600. Rounded values. Excludes provisioning, database recovery, validation and other service-restoration work; transfer time alone is not RTO. 125 MB/s is the theoretical raw rate of 1 Gb/s Ethernet, not its attainable application payload.

Concurrency drives CPU and memory requirements

Veeam’s repository documentation ties CPU requirements to concurrent tasks. For machine-disk processing it specifies 4 GB RAM plus at least 1 GB per concurrently processed disk; unstructured data has different requirements. These are role-specific requirements, not a recommendation for the complete server. Combined roles need combined resources. Repository task limits can prevent excessive simultaneous I/O, and synthetic fulls or health checks must be included in performance planning.

Sources: Veeam: backup repository system requirements · Veeam: repository load control and concurrent tasks

Illustrative transfer-rate requirement: 4 TB moved per backup

MB/s · decimal units · lower window means higher required rate

8-hour window139 MB/s
4-hour window278 MB/s
2-hour window556 MB/s
Calculated by 1IX: 4,000,000 MB ÷ window in seconds. Sustained payload rate only; protocol overhead, contention and processing increase the infrastructure requirement. This is a sizing calculation, not a Dell or Veeam benchmark.

How the offered Dell generations fit

14G · R740xd

The current storage presets use this capacity-oriented platform. Check drive bays, supported disk sizes, controller mode and rebuild behavior before choosing a larger disk.

15G · R750 family

Consider where the repository also needs newer I/O expansion or heavier processing. Confirm backplane, controller and application compatibility in the quoted build.

16G · R760 family

Consider when processing or I/O requirements justify the platform change. Faster memory cannot overcome a saturated network or a slow disk array; size the full data path.

Generation names describe a family, not a guaranteed configuration. R750, R750xs, R760, R760xs, R760xa and storage variants have different limits. Confirm the exact CPU, memory layout, backplane, controller, firmware and software support in your quote.

References and original technical evidence

Turn the workload into an itemized proposal

Share your measurements and growth plan. Ask us to separate equipment pricing from configuration, migration, deployment, support and warranty options, with stock, lead times and service scope confirmed in writing.